How to keep a decision log without writing it
Tracebrain is the AI data layer for companies and enterprises: every night it reads the systems a company connects and writes one verified record of what was decided, promised, paid and delivered, by client, project and department, in plain files the company owns, for its people and its AI agents.
Every company has the same conversation twice: a decision made in March is argued again in September because nobody can find why it was made. A decision log fixes that. This guide covers what a decision log holds, a template you can download, the rules that keep one alive, and what changes when the log is written from the day's messages instead of by hand.
What a decision log holds
One line per decision, with these columns:
- Date. The day it was decided, not the day it was logged.
- Decision. One sentence, as specific as the people who made it said it: "Halvo gets 6% off for a 12-month term", not "pricing discussed".
- Client or project, and the department it belongs to.
- Decided by. The role, so the next person knows whom to ask.
- Why. The reason in one line. This is the column people come back for.
- Alternatives set aside. What else was on the table, so the argument does not start again from zero.
- Where it was said. The mail thread, the chat or the meeting notes, so anyone can read the original.
- Replaces. The earlier decision this one changes, if there is one. Decisions are rarely deleted; they are replaced.
The template
We made one you can copy: download the decision log template (a CSV file that opens in Google Sheets, Excel or Numbers). It has the columns above and two invented examples you can delete.
Rules that keep a decision log alive
- Log the same day. A decision logged a week later is logged from memory, and the reason is the first thing memory loses.
- One owner per team. Somebody whose job includes the log, usually the person who runs the team's weekly meeting.
- Copy, do not paraphrase. Paste the sentence that settled it. A paraphrase is where a 6% discount becomes "about 5%".
- Never edit an old line. When a decision changes, add a new line that replaces it. The history of why it changed is part of the record.
- Read it in the weekly meeting. Five minutes on the week's new lines. A log nobody reads stops being written.
Where the manual log breaks
The log is written somewhere other than where decisions happen. Decisions are made in mail threads, in chats and on calls; the log is a spreadsheet or a wiki page. Every decision costs a second step, by a person who has already moved on, and most decisions are small enough that nobody feels they deserve one. Those small ones, a deadline moved by a day, a scope item dropped, are exactly the ones argued about later.
A log written from the day's messages
The decisions are already written down, in the messages. Tracebrain reads
the systems a company connects and, every night, writes a note for the day:
Daily/2026-11-19.md. Its sections are fixed: the main points, decisions,
what was agreed, what was promised in each direction, money, what is still
open, and the people involved. It is written from that day's messages and
nothing else, and every promise that becomes a task quotes the message
behind it, checked by code against that message before the task is kept.
An invented example of what the decisions section of such a note says:
## Decisions
- Weekly reports to Halvo Logistics move from Monday to Friday: their
board meets on Mondays and wants the report before it.
- The second Halvo site goes live on 1 December, not 24 November.
A note for each week is written from its days (Daily/2026-W47.md), with
the decisions of the week, the clients, the money and the promises still
open. A day that was written is not rewritten, so the log stays as it was
on the day.
The difference from the manual log is the second step: it is gone. Nobody has to notice that a sentence in a thread was a decision.
What works today, and what does not
- Live: the daily and weekly notes, written from mail (Gmail, Outlook or any IMAP mailbox) and team chats that members connected, read-only. Any AI agent can read them over MCP, and everything downloads as plain Markdown files.
- In the integration project: decisions written in the company's own systems, such as tickets and documents.
- Planned: meetings and calls.
Said plainly: a decision made on a call and never written anywhere is not in the note. Keep the template for those, or follow each call with a short message that says what was decided, which also helps the people who were not on it.
The company data layer page says how the record is kept. Tracebrain is set up with each company after a call, and the pricing page says how it is priced.